Highway design for Sainsbury’s Wadsley Bridge

Client Name
Sainsbury's
Location
UK

Challenge

Following a successful planning consent, Sainsbury’s appointed us to progress the detailed design of highway works, including major infrastructure improvements at two junctions along the A61 arterial route into the city from the north, secure technical approvals and manage the construction phase.

An unusual additional challenge was the Tour De France! Its Grande Depart was scheduled for early July, with the second day of racing running directly through the site. We needed to respect embargos on the highway, including no construction works for two weeks before the race, and ensure that the carriageway condition was at the standard needed for riders.

Solution

The construction and traffic management phasing was complex given the working restrictions applied by local authority, however we assisted the contractor in phasing the works to accommodate the requirement for off-peak working and ensure the store could open on time.


Related projects

See all projects
  • Project

    Hertfordshire

    Land East Hemel Hempstead

    Built Environment

    Transport assessment for strategic highway infrastructure project


    Read more
  • Project

    Stansted, UK

    Stansted Northside

    Built Environment

    Highway design for the redevelopment of Stansted Northside


    Read more
  • Project

    Bethlehem, Connecticut, USA

    Town of Bethlehem, Connecticut

    Infrastructure

    Bethlehem, Connecticut bridge projects


    Read more