East Anglia One offshore wind farm

Client Name
Iberdrola
Location
Suffolk

Challenge

SLR’s Place team assisted Iberdrola with compliance phase support for the onshore infrastructure of the East Anglia ONE Offshore Wind Farm.

Solution

SLR produced a variety of landscape plan documentation to address Development Consent Order (DCO) requirements, relating to the detailed design of the onshore substation and onshore cable route. SLR produced the detailed soft and hard landscape scheme for the onshore substation and cable route, landscape maintenance plans, design statement reports addressing the substation façade design and 3D modelling/photomontage visualisations illustrating the appearance of the onshore substation. SLR has been involved in extensive local consultations, including preparation of presentations and attendance at consultation meetings with local authorities and the Design Council. The landscape design and 3D modelling/visualisation of the onshore substation involved liaison with the engineering team on the detailed design aspects related to the landscape design and appearance of the proposed development.

Impact

The project is now at construction stage following successful discharge of DCO requirements.


Related projects

See all projects
  • Project

    UK

    Wirral Growth Company

    Built Environment

    Transport support for Birkenhead Town Centre regeneration


    Read more
  • Project

    North Sydney, New South Wales, Australia

    North Sydney Council

    Built Environment

    Solar Modelling and Installation Detail Design for Council Chambers


    Read more
  • Project

    Perth, Western Australia, Australia

    Public Transport Authority Western Australia and Ertech Keller Joint Venture

    Built Environment

    Perth Stadium construction noise and and vibration management plan


    Read more