Challenge

SLR’s Place team assisted Iberdrola with compliance phase support for the onshore infrastructure of the East Anglia ONE Offshore Wind Farm.

Solution

SLR produced a variety of landscape plan documentation to address Development Consent Order (DCO) requirements, relating to the detailed design of the onshore substation and onshore cable route. SLR produced the detailed soft and hard landscape scheme for the onshore substation and cable route, landscape maintenance plans, design statement reports addressing the substation façade design and 3D modelling/photomontage visualisations illustrating the appearance of the onshore substation. SLR has been involved in extensive local consultations, including preparation of presentations and attendance at consultation meetings with local authorities and the Design Council. The landscape design and 3D modelling/visualisation of the onshore substation involved liaison with the engineering team on the detailed design aspects related to the landscape design and appearance of the proposed development.

Impact

The project is now at construction stage following successful discharge of DCO requirements.


Related projects

See all projects
  • Project

    Multiple Locations, USA

    The American Society of Heating, Refrigerating and Air-Conditioning Engineers

    Built Environment

    ASHRAE climate research project


    Read more
  • Project

    New South Wales, Australia

    North Sydney Council

    Built Environment

    Former Coal Loader adaptive re-use


    Read more
  • Project

    Firth of Forth

    Cierco Ltd

    Power, Renewables & Energy

    Forthwind offshore wind farm seascape, landscape and visual assessment (SLVIA)


    Read more