Challenge

The City of Pawtucket and the Rhode Island Commerce Department made a joint request for a proposal, seeking to revitalize the Seekonk River waterfront.

Solution

SLR worked for Fortuitous Partners and managed the preparation of the Tidewater Landing masterplan. Fortuitous was subsequently selected as the successful developer by the City and State.

The Tidewater Landing project envisions a complete revitalization of the Seekonk River waterfront with waterfront access and amenities, and a substantial development footprint. The development includes a new Sports Event Center, hotel, and substantial office and retail space, anchored by a new soccer stadium that will be home to Rhode Island’s USL Championship soccer franchise.

The project will be a large source of community pride for both the City and State. Since being selected by the City and State, SLR has continued to assist Fortuitous with site due diligence, permitting, and concept design.

Impact

The project is anticipated to continue forward with more detailed design and regulatory permits. Construction is slated to begin in Spring 2022. SLR has been the lead civil, transportation, geotechnical, and water resource engineering firm along with landscape architectural firm for the project. SLR is supported by a talented team of architects on the vertical design of the building structures.


Related projects

See all projects
  • Project

    Hertfordshire

    Land East Hemel Hempstead

    Built Environment

    Transport assessment for strategic highway infrastructure project


    Read more
  • Project

    Connecticut, USA

    Whitney Center

    Built Environment

    Site planning & design for Whitney Life Care Center


    Read more
  • Project

    Stansted, UK

    Stansted Northside

    Built Environment

    Highway design for the redevelopment of Stansted Northside


    Read more