Landscape Planning for Moray Offshore Windfarm

Client Name
Moray Offshore Renewables Ltd (MORL)
Location
Moray Firth

Challenge

Moray East was the first part of the Moray Firth Offshore Wind Farm Zone to be developed, and the first of the Round 3 projects to apply for (2012) and receive (2014) consent. The project is located in the Outer Moray Firth, approximately 22km to the east of the Caithness coast. Part of the consenting process included an Environmental Impact Assessment (EIA), which involved extensive consultation with the individual, organisations and communities.

Solution

As part of the EIA, SLR’s Place team, prepared the Seascape, Landscape and Visual Impact Assessment (SLVIA) for the offshore wind farm, as well as the LVIA for the onshore infrastructure (substation and cable route). SLR prepared the written assessments, visual representations and geographic information to assist with the assessment and interpretation of landscape and visual effects. SLR’s coastal characterisation of the Moray Firth was subsequently used by SNH as a best practice example in its coastal character assessment guidance.

Post-consent, SLR prepared the design statement for the offshore wind farm providing information on the visual aspects of the design evolution of the final Moray East wind farm layout, as required by the Conditions of the Section 36 Consent.

After planning permission in principle was granted in 2015 for the onshore transmission infrastructure, SLR prepared the substation landscape and appearance plans to meet the requirements of consent conditions.The landscape proposals for the substation site were designed to provide visual screening and respond to the rural character of the area with new woodland and hedgerow plantingand grassland habitats.

SLR also prepared the onshore cable route landscape plan relating to the landscape proposals and maintenance of the cable route corridor, providing details of existing and proposed landscape features to be retained and proposed throughout the cable route, including replacement native planting.

Impact

In 2017 Moray East won a 950MW contract for difference and is being delivered early in the 2020’s, with onshore and offshore infrastructure construction works currently in progress. 


Related projects

See all projects
  • Project

    Connecticut, USA

    Private Broadcast Company

    Technology, Media & Telecoms

    Global Broadcast Company corporate campus


    Read more
  • Project

    Fortitude Valley, Queensland, Australia

    Elston

    Built Environment

    Elston House Landscape Frontage


    Read more
  • Project

    Kingswells, Aberdeen, Scotland

    Drum Property Group

    Built Environment

    Prime Four Business Park landscape proposal design and delivery


    Read more