Insight An update on environmental permitting for hydrogen production by electrolysis 18 October 2024 5 minutes read Geopura Ltd (Geopura) has been successful in having the first bespoke environmental permit issued for an electrolysis plant in September 2024. What can we learn as a result of the EA’s determination and what are the implications for environmental permit applications involving hydrogen production by electrolysis? Read more
Project New York, USA New England Interstate Water Pollution Control Commission Infrastructure Dockside Park shoreline stabilisation Read more
Project Bowen Basin, Queensland, Australia BHP Billiton Infrastructure Central Regional Water Network (CRWN) optimisation study Read more
Project Morven, Scotland Yeoman Aggregates (Aggregate Industries) Infrastructure Glensanda Quarry stream diversion design and approval Read more
Project Edinburgh, Scotland Gyle Shopping Centre Infrastructure Gyle Shopping Centre flood studies Read more
Project Etosha National Park, Namibia Confidential Infrastructure Sampling of drinking water in Etosha National Park Read more
Project Twin Waters, QLD, Australia Stocklands Developments Pty Ltd Built Environment Twin Waters flood study Read more
Project Connecticut, USA Kleen Energy Systems Infrastructure Kleen Energy power plant water supply system Read more
Project British Columbia, Canada Public Services and Procurement Canada Built Environment Former fuel oil depot – site investigation and remediation Read more