Shashi wastewater treatment plant performance improvements
- Client Name
- Reckitt Benckiser
- Location
- Shashi, China
Challenge
The Environmental Regulator halted all production at the client’s facility in Shashi due to the performance of the Wastewater Treatment Plant (WTP). This shutdown resulted in significant production losses over the month of lost production.
The WTP had a series of physical, processing and management issues that were preventing it from performing to the regulator’s requirements.
Solution
SLR’s Industrial Wastewater experts within their Process Engineering Group provided on-site technical assistance, so the WTP could meet the regulatory requirements. After three weeks production had restarted, and after three months and further support, the WTP was operating in an ideal fashion.
Impact
By promptly aiding the facility to restart production, SLR staff directly prevented further significant commercial losses from the client.